|
|
PUBLIC |
|
LINCOLN / PHASE 3- 30” WATERLINE
A 6,000-foot water transmission line project in the City of Lincoln, California. Ubora is providing design and construction engineering services for a new 30-inch transmission line and metering/rate of flow control station for a new water delivery take point from Placer County Water Agency (PCWA).
Client: City of Lincoln |
|